Switch language:简体中文 | English

Professional aluminum plate production and wholesale manufacturer

We have been focusing on customized design of aluminum veneer for many years, and choosing us is not wrong!

Information Hotline:

+86 15627778610

Xinlongtai Aluminum Industry (Guangdong) Co., Ltd

Industry information

Company News

Industry dynamics

Frequently asked questions

contact us

Mobile:+86 15627778610

Email: 2201229786

Address: No. 5 Binjiang Road, High tech Zone, Zhaoqing City, Guangdong Province

Installation method and precautions for 2.5mm carved aluminum veneer

  • Author: Xinlongtai Aluminum Industry (Guangdong) Co., Ltd
  • Release time: 2022-03-15 20:30:02
  • Click:0

2.5mm雕刻铝单板的安装方法和注意事项



2.5mm carvingAluminum veneerIt is a high-end building decoration material, and its installation method and precautions are very important to ensure its aesthetics and service life. Below, we will provide a detailed introduction to the installation method and precautions for 2.5mm carved aluminum veneer.

1、 Installation method

1. Determine the installation location

Before installation, it is necessary to determine the installation position and angle of the aluminum veneer. Generally speaking, aluminum veneer should be installed on the exterior walls or roofs of buildings and coordinated with the overall style of the building. Attention should also be paid to the angle of the aluminum veneer to ensure that it can fully absorb sunlight and rainwater.

2. Fixed keel

After determining the installation position of the aluminum veneer, it is necessary to first fix the keel. The keel can be made of angle steel or aluminum alloy material, and needs to be selected according to the size and weight of the aluminum veneer. Fix the keel according to the design requirements and use expansion bolts to fix it to the wall or ceiling.

3. Install aluminum veneer

After the keel is fixed, you can start installing the 2.5mm carved aluminum veneer. First, place the aluminum veneer on the keel, and then fix it to the keel with screws. During the installation process, it is necessary to pay attention to the direction and position of the aluminum veneer to ensure its coordination with the overall style of the building.

2、 Precautions

1. Temperature control

When installing 2.5mm carved aluminum veneer, attention should be paid to the temperature of the environment to avoid deformation or cracking of the aluminum veneer due to temperature changes. Especially during winter construction, measures need to be taken to maintain stable indoor temperature to avoid affecting the quality of aluminum veneer.

2. Moisture proof treatment

Due to the water absorption of 2.5mm carved aluminum veneer, it is necessary to perform moisture-proof treatment before installation. Waterproof coating or coating with a protective film can be used for treatment to prevent the aluminum veneer from being affected by moisture and affecting its service life.

3. Safety protection

During the construction process, it is necessary to pay attention to safety protection measures to avoid accidents. Especially when using welding machines and other equipment, it is necessary to strictly follow the relevant safety operating procedures to ensure the safety and reliability of the construction process.

4. Quality inspection

After installation, it is necessary to conduct quality inspection on the aluminum veneer to ensure that it meets the design requirements and national standards. Especially, attention should be paid to checking the flatness, verticality, and levelness of the aluminum veneer to ensure its aesthetics and service life.

The installation method and precautions for 2.5mm carved aluminum veneer are very important to ensure its aesthetics and service life. In future architectural design, with the increasing demand for building materials, 2.5mm carved aluminum veneer will be more widely used.